ERG
Extraordinary buildings
emergency
Services & Products > Mobile Buildings > Special Buildings > Emergency buildings
What are Emergency Buildings
ERG emergency buildings are an economical & fast solution for emergency housing. They are an ideal solution for immediate housing of the population in cases of natural disasters such as fires, floods, earthquakes, but they can also be used as an asylum for a group of people in case of emergency. They can ensure the fulfillment of the needs as they are adapted and designed according to the requirements and specifications of the interested party.
Applications
In emergency buildings it is possible to apply sliding curtains but also the application of single or double roller door for cases where there is frequent entry-exit. However, it is possible to install one or more security outlets to ensure a proper escape route. Also can be placed inside beds, room dividers, frames (doors & windows), cooling-heating system & electricity supply.
Technical specifications & Construction
ERG buildings can be Mobile or Fixed. The cover is made from durable polyester fabric, coated with PVC with refractory processing class II, total weight of 800gr / m2 per square meter. Upon request, the cover can be made of Panama double- layer PVC fabric with fire safety class II of a total package weight of 1050 gr / m2 . The floor guides are made of steel with a suitable cross-section, which can be canceled with external plugs as well as anchored with a suitable cement base. They can be boxed on the concrete floor, and a special wall bracket can also be created.
Delivery time
Delivery time after check does not exceed 21-45 working days for the most part buildings.
Security & Warranty
The construction materials of ERG buildings ensure stability, guarantee and security. All our products are ISO certified. Also the ERG also provides After Sales Service.
Licensing
The construction of its mobile buildings ERG can be done without always needing a building permit, depending on the area of the construction.
Costing & Offering Issue
Quality
Price
Upon contact, a qualified engineer will visit your space for exploration needs and taking appropriate measurements (if necessary). Then you will be issued an offer based on the design and study of the construction. Finally, once the offer is accepted, the procedures for the implementation of the project begin.
At a glance ...
Immediate & economical turnkey solution
Height from 3m - 7.5m and with special order reaches 9.00m
Installation inside: shelves, lifts
Disassembly and transfer to another location
21sqm - 45sqm from 5 to 15 working days
100sqm - 1,000sqm from 20 to 45 working days
Complete electrical installations
Four basic stages
ERG
After Sales Service